Book a consultation
The interior of a large industrial factory floor

Plant, planning and suppliers in step

Shop-floor systems, ERP and supplier networks rarely share a vocabulary, so planners end up guessing at the signal between demand, capacity and materials.

ERP modernizationShop-floor & IoT pipelinesSupplier EDIPredictive maintenance

Manufacturing data is seldom missing. It is stranded — on machines that do not publish it, in an ERP that cannot receive it, and in supplier emails that nobody can query.

Expertise & outcomes

What we bring, and what it changes

Plant-floor systems, ERP and supplier networks rarely speak the same language, so planners lose the signal between demand, capacity and materials.

Filed under Industry & production
Our expertise
ERP consulting and modernization
Shop-floor and IoT data pipelines
Supplier EDI onboarding
Predictive maintenance models
Business outcomes
Reduced unplanned downtime
Accurate production scheduling
Tighter inventory control
Faster supplier collaboration
The disconnect

Where the signal is lost

Machine data

Lines instrumented well enough to run themselves, and not at all for anyone trying to plan around them.

Planning

Schedules built on last week's capacity assumptions, because this week's never reach the ERP.

Suppliers

Materials confirmed over email, so the shortage becomes visible on the day it stops the line.

Maintenance

Service intervals set by calendar rather than by the condition the equipment is actually reporting.

Data we put to work

What a connected plant actually publishes

The route

From an instrumented line to a plan worth trusting

  1. Instrument

    Collect from the equipment and historians already on the floor, whatever their vintage.

  2. Normalize

    One model for machine, order and material, so two systems stop naming the same thing differently.

  3. Integrate

    ERP, MES and supplier feeds joined, with the exceptions raised rather than buried.

  4. Predict

    Maintenance and demand models trained on the history the pipeline has been accumulating.

FAQs

What manufacturers ask first

Do we have to replace the ERP to do this?

Usually not. Most of the value comes from getting accurate data into and out of the ERP you already run. Modernization is a separate decision, taken on its own merits once the reporting is honest enough to make the case either way.

Our machines are old — can they be instrumented?

In most plants, yes. Older equipment is read through PLCs, historians or edge gateways rather than a modern API, and the pipeline treats those as just another source. Where a machine genuinely cannot publish, we work from the systems around it.

How long before planners see anything?

We sequence the work so one line or one product family reports properly first, typically well before the full estate is connected. That first slice is what tells you whether the model matches the floor.

Start with your sector

Tell us which of these you operate in and where the systems are getting in the way. We will come back with the practices, the people and a realistic sequence.

Talk to our expertsCall the team
+1-562-916-3390 · Los Angeles, CA